Reducing costs and saving the environment

This site has 9 x 7.5 kW cooling towers and 2 x 15 kW towers and with the installation of the new Danfoss Variable Speed Drives and EMC cables the savings were quite substantial.

The power consumption was reduced by approximately $72,000 per annum.

The mechanical wear and tear on these tower was also i bought adderall online significantly reduced also.

Quantum Plant Maintenance had supplied the drives, cable, metal housed isolators, cable tray and the labour to install these drives.

The isolators were moved from the inside of the towers to a clearly labeled central isolation point at the towers location.

The pay back period was approximately 8 months.